Useful And Essential Facts About Louisa Modular Homes

By Margaret Reed


A construction where a home is built off the site before it is transferred to the location of installation is called Modular construction. This form of construction can also be referred to as systems built construction or pre fab construction. However, some people think these words refer to different modes of construction, which is actually not true. This is worth knowing about Louisa modular homes.

To begin with, a permanent foundation is made in advance at the construction site. A modular home is then delivered to the site and installed on the premade foundation. The home then becomes permanent on the site and cannot be moved once it has been installed on the foundation. Since such homes are constructed offsite, most people tend to think that they are not as good as homes constructed onsite.

A lot of change has happened to that even though the concern may have had some truth to it a few decades back. Nowadays, pre-fab homes are normally built in such a manner that they are highly durable and very strong. Site-built homes are even weaker than some pre-fab homes. One can also include as many modules as they see fit, but typically, a pre-fab home has between 3 and 7 modules.

A total footage of 3000 square feet or more is what a typical home can be. Improved technology has rendered it feasible to design a home of any size and shape that one prefers. Oval, rectangle, circle, and square are shapes that individual modules may be constructed into. In some cases, it is possible to have one module incorporating more than one shape.

When the modules are transported to the site of installation, they are usually not complete. Most of them are usually between 70 and 90 percent complete. That means that the remaining work is usually completed at the site of installation. In most cases, this involves final touches, which can be done within a short period of time. The final touches are completed after the module has been installed onto the foundation.

Large trucks transport the modules on the road. When the truck reaches the installation site, a crane offloads the modules and then places them onto the foundation. Thereafter, the construction team performs the remaining tasks to complete the whole process of construction and installation.

The tasks carried out after the modules have been installed are referred to as final touches. They include activities like tying in the siding, interior finishing, as well as installing the roof section. After the final touches, the construction company will have completed its job. The owner can now hire a private builder to add other extra features. Such features may include decks, garages and porches. However, if the owner has the skills required to make the additional features, they can choose to do the job instead of hiring a private builder.

Reports from FEMA show that modular houses have a high resistance to hurricanes as compared to conventional ones. This makes modular homes acceptable in the United State by local, state and the federal governments. For this to be effective, strict standards are set that manufacturers must always comply with during the entire process of constructing modular homes.